Skip to content
ETROWAY

Enterprise · Electrical

EV chargers

Home and workplace EV charger installation with load management.

WA Electrical Contractor EC17998

What’s included

  • Single and three-phase chargers for home and work
  • Load management so your supply is not overloaded
  • Dedicated circuit and safety certificate

Home and workplace EV charger installation with load management.

EV chargers

Frequently asked questions

What people ask us about ev chargers in Western Australia. Search, or open a question and share the link.

All electrical questions →

8 of 8 questions

Yes. A home or workplace EV charger draws a sustained high load for hours, so it needs its own circuit from the switchboard with its own protection, installed by a licensed electrician. Plugging a car into an ordinary power point on a shared circuit is slow and can overload the wiring. We install the circuit, the charger and the protection and issue the Electrical Safety Certificate.

Type 2 is the common connector in Australia and most cars sold here use it, either with a tethered cable or a socket you plug your own cable into. Single-phase chargers suit most homes; three-phase chargers charge faster where the supply allows. We recommend a charger based on your car, your switchboard and your supply rather than the most expensive option.

Often yes, sometimes with help. The switchboard needs a spare way and the right protection, and the supply from the Western Power network has to have the capacity for the charger on top of everything else. We check both before quoting and tell you whether a straightforward install, load management or a mains upgrade is the right path.

Load management means the charger watches how much the rest of the property is drawing and reduces its own rate so the total never exceeds the supply. In many homes and small businesses it avoids the cost and delay of a consumer mains upgrade entirely. Where a site wants several chargers, load management shares the available supply between them.

A standard home installation with the charger close to the switchboard is usually done in half a day. Longer cable runs, a detached garage or a switchboard that needs work take longer, and a mains upgrade adds network operator lead time. We give you a fixed written quote and timeline after a site visit or a photo assessment.

It depends on the charger, the cable run, whether the board needs work and whether load management is included, so we quote fixed in writing before any work starts. Our call-out and labour rates are published on the Pricing page and there are no hidden fees. The charger itself can be supplied by us or by you.

Yes. We design for multiple chargers with load management, user access control and energy monitoring, and we handle the switchboard and mains work and the network operator paperwork with Western Power. Because Metroway also does networking and automation, the chargers can be connected to your network and billing system in the same job, with one point of contact and one bill through Metroway365.

Yes. Every charger installation is tested and you receive an Electrical Safety Certificate from the licensed electrical contractor, with a notice of completion lodged with the network operator where the work is notifiable. Keep it with your records, as some car manufacturers and insurers ask for it.

Still have a question?

Ask us. Straight answers from local people, no obligation and no sales script.

Enterprise

Talk to us

Multi-site rollouts, departments, government and custom agreements with SLAs. Tell us about your organisation and we arrange a conversation.

Asking about: EV chargers