Commercial · Electrical
Switchboard upgrades
Replace fuse boards with modern switchboards, RCDs and circuit breakers.
Quoted per site
WA Electrical Contractor EC17998
What’s included
- New board with RCDs and circuit breakers
- Labelled circuits and tidy wiring
- Electrical safety certificate on completion
Replace fuse boards with modern switchboards, RCDs and circuit breakers.
Switchboard upgrades
Frequently asked questions
What people ask us about switchboard upgrades in Western Australia. Search, or open a question and share the link.
All electrical questions →7 of 7 questions
The clearest signs are ceramic or rewirable fuses, no safety switches (RCDs), an asbestos backing panel, circuit breakers that trip for no obvious reason, or a board with no spare ways when you want to add air-conditioning, a pool pump or an EV charger. Older boards were built for far less load than a modern home or business draws. If you are not sure, send us a photo of the board and we will tell you honestly whether it needs work.
There is no blanket rule that every old board must be replaced. What WA law does require is that a residential property has at least two RCDs protecting all power and lighting circuits when it is sold or newly rented, and that any new or altered wiring meets the current standards. On many older boards the practical way to meet those requirements is a new board, because the old enclosure has no room for the extra devices.
A new enclosure, circuit breakers on every circuit, RCD protection as required, a main switch, proper labelling of each circuit, and tidy terminations so the next electrician can see what they are working on. If the backing panel contains asbestos it is removed and disposed of correctly. The work is tested and you receive an Electrical Safety Certificate on completion.
A straightforward domestic board is usually done in a day, with the power off for most of that day while the old board comes out and the new one goes in. Larger commercial boards are planned in stages or after hours so the business keeps running. We confirm the timing in the written quote so you can plan around it.
It depends on the number of circuits, whether the board is single or three phase, and whether the enclosure or backing panel needs replacing, so we quote it fixed in writing after a site visit. Our call-out and labour rates are published on the Pricing page and there are no hidden fees. The quote is the price, unless you ask us to add something.
A licensed electrician, either from Metroway or one of our licensed electrical contractor partners across WA, with Metroway as your single point of contact for the quote, the work, the report and the bill. On completion you receive an Electrical Safety Certificate, and where the work is notifiable a notice of completion is lodged with the network operator, Western Power or Horizon Power. Keep the certificate with your property records; agents, buyers and insurers ask for it.
Yes, and this is where Metroway is different. Because we also do the networking, automation, cameras and EV charging, we size the board and leave the spare ways and provisions for what you are planning, not just what you have today. It is one job with one bill through Metroway365 instead of three contractors each opening the board.
Still have a question?
Ask us. Straight answers from local people, no obligation and no sales script.
Commercial
Message us
Tell us about your business, how many people and devices, and what you need. We come back with a fixed quote at our published rates, or start with a free consultation. One contact, one Metroway365 bill.
Asking about: Switchboard upgrades